QUOTATION FOR CONSTRUCTION WORK AT BAHRIA TOWN, KARACHI 500 SQUARE YARD PLOT (GROUND + 1 PROJECT WITH BASEMENT ) 50 x 90 SCOPE OF WORK A1

SCOPE OF WORK A1

DETAILS OF STRUCTURE WORK:

• RCC Structure as per Drawing
• RCC Structure Concrete Ratio As per Drawing
• Chemical mixing in Mortar
• Using Amreli steel As per Bahria Standards 60grade
• Using Falcon cement
• Water proofing chemical use in mortar up to Plinth Level
• Using Vibrator
• Using Compactor
• O/H and U/G Tank Structure
• Using water proofing chemical
• Using chemical for leakage.

DETAILS OF SHUTTERING WORKS:

• Shuttering with Ply will be used up to Plinth Level
• All other will be Partal Wood Shuttering

DETAILS OF WOOD WORK:

Door Frame: ( Red Meranti /) Wood with polish and Termite proofing oil.
Panel Door: ( Red Meranti / ) wood with polish (height will be as per bahria Standards).
Bidding: ( Red Meranti / ) Wood Double side with polish.
Sliding Window: Aluminium Windows best quality will be used taken care by the Contractor As per Bahria Standard

Wardrobes: As Per Drawing, using Golden Teak wood Frame and Golden Teak Veneer Board using Acrylic Sheet.Brand Of Al Noor premium quality

Kitchen Cabinets Work: As Per Drawing, using Golden Teak Wood Frame and Acrylic Sheet. Best quality will be used, complete in all respect using Golden Teak Veneer Board with polish.

DETAILS OF PLUMBERING WORK:

• PLUMBERING WORK of entire bathroom hot & cold lines. PPR Minhas pipe lines.

• SEWERAGE WORK with imported pipes, Pak Arab

• BATHROOM C.P FITTINGS with Grohe/ Porta set (Price Range Rs.25000 / 30000 /Rs )

• CERAMICS COMMODES/WC AND WASH BASIN will be used PORTA/ (one Piece Toilet Using 25000 to 28000 each washroom) wall hanging system

• S.S BATHROOM ACCESSORIES will be used grohe brand

• KITCHEN FITTINGS with PPR Minhas pipe lines.

• KITCHEN SINK AND MIXER PORTA (Rs.12000 -Rs.15,000).

DETAILS OF FLOORING AND TILE WORK:

FLOORING WITH PORCELAIN TILE LASER CUT IMPORTED SINGLE FACE TILE
• Size 2′ x 2′ with design and same colour Grouting
• Price Range of Tile (Rs.. Rs.. 1700/- 1800/ meter)

MARBLE STEPS CHEMICAL POLISHED FOR STAIR CASE
• 3/4″ thick tread and
• Designed riser 1/2 ” thick
• Mid Landing

RAILING FOR STAIR CASE
• Using Golden Teak Wood with Pipe. Best quality will be used.

ROOF FLOORING USING
• Water Proofing and Cement Floor Material

BATHROOM TILING UP TO 9′ HEIGHT WITH PORCELAIN TILE LASER CUT IMPORTED SIZE
• 12″ x 18″ Or 12″ x 24″ With Border. Vibratory tiles or Tough Paver in porch / driveway/galis and ducts

DETAILS OF KITCHEN WORK:
• AS Per Drawing
• Granite will be used for Kitchen Top Slab
• Gas Connection for Kitchen Stove and Geyser Connection in Gali
• Marble will be used on the side of cabinets.

DETAILS OF PAINT WORK:
• All Internal Paint Work With Matt Finish Imported Colour as per client request front Elevation paint colour As per Bahria
• External Walls Finish With Graphics, Stone Pitching (As Per Drawing). Weather Shield.

DETAILS OF BLOCK MASONARY AND PLASTER WORK:
• Block Masonry 6″ x 8″ x 12″ With Grouting ratio 1:6 Machine made
• Hollow Blocks will be used where sun shaded area
• 1/2″ – 3/4″ Thick Plaster with ratio 1:4
• Good Finish Quality.

DETAILS OF ELECTRIC WORK:
• Electrical work as per drawing
• Separate distribution board on each floor
• Wiring with Pakistan Cables
• Switch/Socket imported SWITCHKIT Metal Sheet ( Rs.3,500/- to Rs.5,000/-)
• Exhaust fan in each Bathroom and Kitchen PAK FANS

CONNECTION POINTS FOR
• TV cables
• Internet
• UPS
• Generator
• Telephone
• CCTV
• AC piping

(Note: All Required Test Are Done by Our Self.)

TERMS AND CONDITIONS
• Total time of construction will be within 6 to 8 Months.

• All the documentation of works will be handled by Contractor.

• In case of any penalty, will be borne by the Contractor.

• In case of cancellation of Agreement from client side, advance payment will be forfeit.

• Electricity and Maintenance Bill during the construction will be borne by the client.

• In case of any price hike in raw material up to 5% will be borne by Contractor and more than 5% will be borne by Owner of the plot. If any price reduction in raw material more than 5%, benefit will be given to Owner of the plot.

• Key of the Villa will be handed over to Owner after finalization of construction within the agreed period.

• Mode of payment for all construction work from start to end will be as follows:-

S.NO. DESCRIPTION AMOUNT
(PAK RUPEES)
1 Signing Amount At the Day Of agreement (Rs 500,000)
2 Mobilization Advance Before Digging 1 week (Rs 1,500,000)
3 After Completion of Plinth Level Time (Rs 1000,000)
4 After Completion of Ground Floor (Rs 700,000)
5 After Completion of First Floor Roof  (Rs 700,000)
6 After Completion of Electrical & Plumbering, Plastering and Door Frames
(Rs 700,000)
7 After Completion of Flooring & Tile Work, False Ceiling, Doors, Wardrobes
(Rs 500,000)
8 After Completion of Bathrooms & Kitchens (Rs 500,000)
9 Final Finishing (Rs 400,000)

G.TOTAL (No Hidden Charges) Key will Delivered6,500,000

Documentation charges For Starting Construction 125 sq yards


• DESIGN LAYOUT CHAGRES PAY TO BTK ( 85500 Rs )
• SOIL TESTING ( 30,000 Rs ) Two bore holes
• MEP DRAWING ( 30,000 Rs )
• STRUCTURE DRAWING (30,000 Rs )
• COMPLETION CHAGRES PAY TO BTK ( 98500 RS )

If there is any extra land in plot Bahria will be charge as per policy 10,000 per yard


THESE ALL CHAGRES WILL BE PAID BUY THE PLOT OWNER ALL THE DOCUMENTATION WORK WILL BE HANDLING BUY CONTRACTOR

About Us

BTK Value company based in Karachi. We endeavor to provide our client with the highest quality finished products, at the best price and as expeditiously as possible In order to achieve this mission, we operate from a solid foundation of corporate beliefs. Our employees share the cooperate philosophy that emphasizes individual’s respect, quality service, cost Efficiency, productivity, and team effort.

Contact Us

Address: 502 5 floor Zenith Plaza, Main

Jinnah Avenue Bahria town Karachi

Tel: 03001077709

Email: Sales@btkvalue.com

Business Hours: 24 Hours Available

Compare listings

Compare
Call Now Button
Open chat